Central Silk Board | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Namma Metro station | ||||||||||||||||
General information | ||||||||||||||||
Location | Outer Ring Rd, Central Silk Board Colony, Stage 2, BTM Layout, Bengaluru, Karnataka 560068 | |||||||||||||||
Coordinates | 12°54′59″N 77°37′14″E / 12.91652°N 77.62056°E | |||||||||||||||
Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | |||||||||||||||
Operated by | Namma Metro | |||||||||||||||
Line(s) | Yellow Line Blue Line | |||||||||||||||
Platforms | Side platform Platform-1 → Rashtreeya Vidyalaya Road Platform-2 → Bommasandra Side platform (TBC) Platform-3 - Train Terminates Here Platform-4 - Krishnarajapura or KIAL Terminals Platform numbers (TBC) | |||||||||||||||
Tracks | 4 (TBC) | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated, Double track | |||||||||||||||
Platform levels | (TBC) | |||||||||||||||
Parking | (TBC) | |||||||||||||||
Accessible | (TBC) | |||||||||||||||
Other information | ||||||||||||||||
Status | Awaiting trainsets Under Construction | |||||||||||||||
Station code | (TBC) | |||||||||||||||
History | ||||||||||||||||
Opening | December 2024 (TBC) 2026 (TBC) | |||||||||||||||
Electrified | 750 V DC third rail | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Central Silk Board is an important, upcoming elevated interchange metro station on the North-South corridor of the Yellow Line and Blue Line[1] of Namma Metro in Bengaluru, India. This metro station serves the Central Silk Board area.
As per latest reports, the Yellow Line is stated to be operational around December 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations [2][3][4][5][6] (under Blue Line, around 2026).