Central Silk Board | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Namma Metro station | ||||||||||||||||
General information | ||||||||||||||||
Location | Outer Ring Rd, Central Silk Board Colony, Stage 2, BTM Layout, Bengaluru, Karnataka 560068 | |||||||||||||||
Coordinates | 12°54′59″N 77°37′14″E / 12.91652°N 77.62056°E | |||||||||||||||
Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | |||||||||||||||
Operated by | Namma Metro | |||||||||||||||
Line(s) | Yellow Line Blue Line | |||||||||||||||
Platforms | Side platform Platform-1 → Rashtreeya Vidyalaya Road Platform-2 → Bommasandra Side platform (TBC) Platform-3 - Train terminates here Platform-4 - Krishnarajapura or KIAL Terminals Platform numbers (TBC) | |||||||||||||||
Tracks | 4 (TBC) | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated, double track | |||||||||||||||
Platform levels | (TBC) | |||||||||||||||
Parking | (TBC) | |||||||||||||||
Accessible | (TBC) | |||||||||||||||
Other information | ||||||||||||||||
Status | Awaiting trainsets Under construction | |||||||||||||||
Station code | (TBC) | |||||||||||||||
History | ||||||||||||||||
Opening | 25 January 2025 (TBC) 2026 (TBC) | |||||||||||||||
Electrified | 750 V DC third rail | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Central Silk Board is an important, upcoming elevated interchange metro station on the north-south corridor of the Yellow Line and Blue Line[1] of Namma Metro in Bengaluru, India. This metro station serves the Central Silk Board area.
As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[2] due to lots of trial runs along with more trainsets which are needed for commencement of operations.[3][4][5][6][7] Meanwhile, the elevated section of Blue Line covering a distance of 58.2km (Central Silk Board - KIAL Terminals via Krishnarajapura), is expected to be operational around June 2026.