General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | 2600, Centre Street Montreal, Quebec H3K 1K1 Canada | ||||||||||
Coordinates | 45°28′42″N 73°34′10″W / 45.47833°N 73.56944°W | ||||||||||
Operated by | Société de transport de Montréal | ||||||||||
Connections | |||||||||||
Construction | |||||||||||
Depth | 24.4 metres (80 feet 1 inch) (Angrignon) 29.6 metres (97 feet) (Honoré-Beaugrand platform), Deepest | ||||||||||
Accessible | No | ||||||||||
Architect | Ayotte et Bergeron | ||||||||||
Other information | |||||||||||
Fare zone | ARTM: A[1] | ||||||||||
History | |||||||||||
Opened | 3 September 1978 | ||||||||||
Passengers | |||||||||||
2023[2][3] | 1,524,977 20.09% | ||||||||||
Rank | 54 of 68 | ||||||||||
Services | |||||||||||
|
Charlevoix station is a Montreal Metro station in the borough of Le Sud-Ouest in Montreal, Quebec, Canada.[4] It is operated by the Société de transport de Montréal (STM) and serves the Green Line. It is located in the district of Pointe-Saint-Charles. It opened on September 3, 1978, as part of the extension of the Green Line westward to Angrignon station.