General information | |
Status | Topped-out |
Address | 505 Preston Street |
Town or city | Ottawa |
Country | Canada |
Coordinates | 45°23′53″N 75°42′27″W / 45.3981°N 75.7075°W |
Groundbreaking | 2015 |
Topped-out | 2019 |
Estimated completion | 2022 |
Height | 143 m (469 ft) |
Technical details | |
Floor count | 45 |
Floor area | 22,047 m2 (237,310 sq ft) |
Grounds | 1,646 m2 (17,720 sq ft) |
Design and construction | |
Architecture firm | Hariri Pontarini Architects |
Developer | Claridge Homes |
Engineer | Smith + Andersen |
Main contractor | Bellai Brothers Construction |
Other information | |
Number of units | 320 |
Parking | 303 |
Website | |
claridgehomes | |
[1][2] |
The Claridge Icon is a 45-storey condominium tower in Ottawa, Ontario, Canada. It is located at the intersection of Carling Avenue and Preston Street in Little Italy.[1][3] When the structure topped out in 2019, it became the tallest building in Ottawa since 1971 and the tallest in Ottawa-Gatineau since 1978.
The building was designed by Hariri Pontarini Architects and built by Claridge Homes.[3] It has suffered lengthy delays. When first announced in 2012, Claridge aimed for opening in late 2016.[4] Once construction had begun in 2015, it was planned to be ready for occupancy in 2018.[5]
Early during construction in March 2016, a worker was struck and killed by a 12-metre (39 ft) chunk of ice that fell from the side of the construction pit.[6] This resulted in a year-long delay and charges against the developer and main contractor (which were fined $325,000 each in May 2019).[7] Construction work was halted again in March 2018 when a worker fell 3 metres (10 ft) from a platform and suffered a head injury.[8]