Collgar Wind Farm

Collgar Wind Farm
Collgar Wind Farm in 2019
Map
Collgar Wind Farm in Australia
CountryAustralia
LocationNear Merredin
Coordinates31°32′35″S 118°27′16″E / 31.5430556°S 118.4545833°E / -31.5430556; 118.4545833
StatusOperational
Construction beganJune 2010
Commission dateMarch 2012 (2012-03)
Construction costA$750m
OwnerRetail Employees Superannuation Trust
Wind farm
TypeOnshore
Hub height80 metres (262 ft)
Rotor diameter90 metres (295 ft)
Site area18,000 hectares (180.00 km2)
Power generation
Units operational111 × 2.0 MW
Make and modelVestas V90-2MW
Nameplate capacity222 MW
Capacity factor34.24% (average 2012-2020)
Annual net output665.8 GWh (average 2012-2020)
External links
Website[www.collgarwindfarm.com.au]

Collgar Wind Farm is a wind farm located approximately 25 kilometres south-east of Merredin, Western Australia.[1] It is operated by Collgar Renewables. With 111 Vestas V90-2.0MW wind turbines,[2][3] and a total installed capacity of 222 MW registered with AEMO,[4] it is Western Australia's largest wind farm. It became fully operational in October 2011[5] and is expected to generate 750 GWh per year on average over the 30-year life of the project.[1]

  1. ^ a b Quinn, Russell: WA's biggest wind farm is now online Archived 18 April 2011 at the Wayback Machine, in Perth Now, 15 April 2011
  2. ^ Collgar Wind Farm: Site location and layout, retrieved 12 May 2011
  3. ^ Merredin Mercury: First power generated, 11 May 2011
  4. ^ Collgar Fact Sheet, retrieved 30 August 2022
  5. ^ Collgar Wind Farm: About, retrieved 30 August 2022