DEx12 expressway | ||||
---|---|---|---|---|
Drumul expres DX12 | ||||
Route information | ||||
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România | ||||
Length | 71.6 km (44.5 mi) 49.5 km (30.8 mi) under construction 121.1 km (75.2 mi) planned | |||
Existed | 2022–present | |||
Major junctions | ||||
From | A 1 near Pitești | |||
To | A 6 near Craiova (planned) | |||
Location | ||||
Country | Romania | |||
Counties | Argeș, Olt, Dolj | |||
Highway system | ||||
|
The DEx12 expressway (Romanian: Drumul expres DEx12), also known as the Pitești–Craiova Expressway (Romanian: Drumul expres Pitești–Craiova), is a partially built expressway in the south-western part of Romania, previously labelled as A12, when it was considered as a future motorway.[1] It will connect the cities of Pitești (branching off the A1 motorway), Slatina and Craiova (where it is planned to merge with the also planned A6 motorway), being 121 km long, with an estimated total cost of 1.66 billion euro.[2]
As of 23 December 2023, the Balș - Colonești segment is in service, totaling 71.6 km (44.5 mi).