Dover MRT station

 EW22 
Dover
杜弗
டோவெர்
Mass Rapid Transit (MRT) station
A side platform which is separated from the train with half-height platform screen doors.
Platform A of Dover station
General information
Location200 Commonwealth Avenue West
Singapore 138677
Coordinates1°18′40.73″N 103°46′43.17″E / 1.3113139°N 103.7786583°E / 1.3113139; 103.7786583
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)     East–West Line
Platforms2 (2 side platforms)
Tracks2
ConnectionsBus, Taxi
Construction
Structure typeElevated
Platform levels1
ParkingYes (Singapore Polytechnic)
Bicycle facilitiesYes[1]
AccessibleYes
History
Opened18 October 2001; 23 years ago (2001-10-18)
ElectrifiedYes
Previous namesSingapore Polytechnic
Passengers
June 20247929 per day[2]
Services
Preceding station Mass Rapid Transit Following station
Buona Vista
towards Pasir Ris
East–West Line Clementi
towards Tuas Link
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Dover
Dover station in Singapore

Dover MRT station is an elevated Mass Rapid Transit (MRT) station on the East West line (EWL) in Singapore. Located along Commonwealth Avenue West, the station is directly linked to Singapore Polytechnic and serves various residential developments in the area. The station is operated by SMRT Trains.

The station was first planned in 1988 before construction of the station was announced in 1997. The first infill station on the MRT network, contractors had to ensure safety without disrupting services on the EWL, which included building a temporary steel tunnel over the tracks. The station opened on 18 October 2001. Designed by RSP architects, the station has a distinctive arched roof supported by steel columns and floor-to-ceiling glass panels along the concourse.

  1. ^ "Dover – Amenities". SMRT Journeys. SMRT Corporation. Archived from the original on 12 May 2024. Retrieved 9 June 2017.
  2. ^ "Land Transport DataMall". mytransport.sg. Land Transport Authority. Archived from the original on 14 August 2024. Retrieved 14 August 2024.