Review waiting, please be patient.
This may take 6 weeks or more, since drafts are reviewed in no specific order. There are 1,274 pending submissions waiting for review.
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
Reviewer tools
|
Submission declined on 24 November 2024 by DoubleGrazing (talk).
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
This draft has been resubmitted and is currently awaiting re-review. |
Submission declined on 23 November 2024 by Chaotic Enby (talk). This draft's references do not show that the subject qualifies for a Wikipedia article. In summary, the draft needs multiple published sources that are: Declined by Chaotic Enby 44 hours ago.
|
This article may require copy editing for grammar and usage. (November 2024) |
Also the Qubein Arena | |
Full name | Qubein Center (Nido & Mariana Qubein Center, Conference Room and Kahn Hotel) |
---|---|
Location | 1050 Panther Drive High Point, NC 27262 |
Coordinates | 35°58′42″N 79°59′48″W / 35.978333°N 79.996667°W |
Owner | High Point University |
Operator | High Point University |
Capacity | 4,500 (5,000 including suites)[6] |
Surface | Hardwood |
Construction | |
Broke ground | September 22, 2018[1] |
Opened | September 24, 2021[2] |
Construction cost | $170 million[3] |
Architect | CJMW Architecture, Perkins&Will[4] |
General contractor | Samet Corporation & Christman Company[5] |
Tenants | |
High Point Panthers men's basketball (2021-present) High Point Panthers women's basketball (2021-present) |
- in-depth (not just brief mentions about the subject or routine announcements)
- reliable
- secondary
- strictly independent of the subject
Make sure you add references that meet all four of these criteria before resubmitting. Learn about mistakes to avoid when addressing this issue. If no additional references exist, the subject is not suitable for Wikipedia.