Dubai Trolley | |
---|---|
Overview | |
Status | Inactive |
Owner | Emaar Properties |
Locale | Dubai, United Arab Emirates |
Service | |
System | Tram |
History | |
Opened | 2015 |
Closed | 2019 |
Technical | |
Line length | 1.1 km (0.68 mi) (Phase I) 4.6 km (2.9 mi) (total) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in)[1] |
Operating speed | 16 kilometres per hour (9.9 mph)[1] |
Dubai Trolley is a tram system in Downtown Dubai. It includes a number of trams specially designed for Emaar Properties, with an operational speed of 10 km per hour. The trolleys are double-decker and can convey 50 passengers, who can ride on the open deck or the air-conditioned seating. They convey passengers free of charge.
The Dubai Trolley project was announced by Emaar Properties on 23 April 2008, with opening proposed for the end of 2009.[2] The total cost was put at AED 500 million.[3]
The line on which the Dubai Trolleys travel will be built in three phases which will form a 7 km loop around Downtown Dubai.[1]
As of 2019, Dubai Trolley is out of operation. Poles are located at tracks, tram vehicle number one is displayed to the public in the street, depot is used as a commercial area.