Overview | |
---|---|
Dates of operation | 21 May 1858–1962 |
Successor | Stockton and Darlington Railway (1862) North Eastern Railway (1863) London and North Eastern Railway (1923) British Railways (1948) |
Eden Valley Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Eden Valley Railway (EVR) was a railway in Cumbria, England. It ran between Clifton Junction near Penrith and Kirkby Stephen via Appleby-in-Westmorland.
Passenger traffic ended in 1962 and the line was reduced to the track between the junction at Appleby station with the Settle-Carlisle Line and Kirkby Stephen which served a quarry. By 1976 all that was left was 6 miles (10 km) of track between Appleby in Westmorland and Flitholme. It was used by infrequent British Army services to Warcop Training Area until 1989.
In 1995 the Eden Valley Railway Society was formed with the aim of reinstating services and restoring on the line. Heritage railway services resumed in 2006 between Warcop and Sandford, with an extension of 1⁄2 mile (0.8 km) being opened in 2013, giving a current running line of almost 2+1⁄4 miles (3.6 km).