Ellenbrook line

Ellenbrook line
View from a bridge of an under construction railway line in the median of a highway
Ellenbrook line within Tonkin Highway south of Collier Road, June 2024
Overview
Other name(s)Morley–Ellenbrook line
StatusUnopened
OwnerPublic Transport Authority
LocalePerth, Western Australia
Termini
Stations5 (branch)
13 (total)
Service
TypeSuburban rail
SystemTransperth
Operator(s)Public Transport Authority
Depot(s)Claisebrook railcar depot
Rolling stockTransperth B-series trains
History
CommencedJanuary 2022 (January 2022)
Planned opening8 December 2024 (8 December 2024)
Technical
Line length27.9 km (17.3 mi)[a]
Number of tracks2
CharacterAt-grade and elevated
Track gauge1,067 mm (3 ft 6 in) narrow gauge
Electrification25 kV 50 Hz AC from overhead catenary
Operating speed130 km/h (81 mph)
SignallingFixed block signalling
Train protection systemAutomatic train protection
Route map

Ellenbrook Bus transfer
Whiteman Park Bus transfer
Ballajura Bus transfer
Noranda
Morley Bus transfer
Bayswater Bus transfer

The Ellenbrook line, known as the Morley–Ellenbrook line during construction, is an unopened suburban railway line and service in Perth, Western Australia, which will be operated by the Public Transport Authority as part of the Transperth system. The line branches from the Midland line at Bayswater station and heads north-north-west to serve five new stations along a 21.3-kilometre (13.2 mi) route to Ellenbrook. Ellenbrook line services will continue west of Bayswater station alongside Midland and Airport line services to terminate at Perth station in the central business district.

Land for a transit line to Ellenbrook was reserved in the 1990s during the first stages of the development of Ellenbrook as a "master planned community". A railway line to Ellenbrook was promised by both major political parties in the leadup to the 2008 state election, but it was cancelled by the Liberal government after winning the election. After the Labor Party won the 2017 state election, the Ellenbrook line began planning as part of the wider Metronet project. Enabling works within the Tonkin Highway median strip were undertaken by the Tonkin Gap project, which started construction in November 2020 and was completed in early 2024. The main Ellenbrook line contract was awarded to Laing O'Rourke in October 2020 and construction began in January 2022. The main contract's original budget was $1.123 billion, which was increased in 2023 to $1.651 billion. The first station was completed in March 2024 and tracklaying was completed by July. The first train entered the line in August and the line is planned to open on 8 December 2024.

Branching from the Midland line at Bayswater station, the Ellenbrook line enters a viaduct to exit the Midland line via a flying junction before entering the median strip of Tonkin Highway through a short tunnel. The line heads north from there, stopping at Morley and Noranda stations, before exiting the highway through another tunnel to reach Ballajura station. The Ellenbrook line then runs east along the southern side of Whiteman Park before bending north to head between Whiteman Park and Drumpellier Drive to reach Whiteman Park station. North from there, the line enters Ellenbrook to terminate at Ellenbrook station.

The Ellenbrook line is planned to have a frequency of five trains per hour during peak, reducing to four trains per hour off peak, operated by B-series trains. Peak frequencies are planned to increase to six trains per hour by 2031, which will require upgrades to signalling to accommodate the Ellenbrook line alongside Airport and Midland line services. All stations along the branch are fully accessible and have 150-metre-long (490 ft) platforms, but train lengths are limited by 100-metre (330 ft) platforms between Perth and Bayswater. The branch is forecast to have 11,753 boardings per weekday upon opening, increasing to 18,070 boardings per weekday in 2031.

  1. ^ Cite error: The named reference Rail Access Manual was invoked but never defined (see the help page).


Cite error: There are <ref group=lower-alpha> tags or {{efn}} templates on this page, but the references will not show without a {{reflist|group=lower-alpha}} template or {{notelist}} template (see the help page).