Erding Ring Closure |
---|
Planning overview from Bavarian Transport Ministry with Erding Ring Closure, S-Bahn expansion and Walpertskirchen Link |
|
Native name | Erdinger Ringschluss |
---|
Line number | 5559 |
---|
Locale | Bavaria, Germany |
---|
|
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
---|
Electrification | 15 kV/16.7 Hz AC overhead catenary |
---|
|
|
|
|
|
|
|
|
|
40.7
|
Freising
|
(446 m)
|
|
|
|
40.0
|
|
|
|
|
36.2
|
Pulling
|
|
|
|
|
Neufahrn-Nord
|
|
|
|
1.5
|
|
|
|
|
0.8
|
|
|
|
|
0.6
|
|
|
|
|
|
Neufahrn-Ost
|
|
|
|
33.5
|
Mintraching
|
|
|
|
33.8
|
B 11
|
|
|
|
|
|
|
|
|
37.4
|
|
|
|
|
|
Flughafen-West
|
|
|
|
30.8
|
Besucherpark
|
|
|
|
|
|
|
|
|
|
Munich Airport
|
|
|
|
24.8
|
|
|
|
|
23.9
|
Schwaigerloh
|
(443 m)
|
|
|
|
23.3
|
Wendeanlage
|
|
|
|
20.3
|
St2580 (Airport East Tangent)
|
|
|
|
19.8
|
Central Isar Canal
|
|
|
|
|
Walpertskirchen Link junction
|
|
|
|
8.7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Erding-Fliegerhorst station
|
(460 m)
|
|
|
|
14.2
|
|
|
|
|
13.8
|
|
|
|
|
13.6
|
Erding
|
(464 m)
|
|
|
|
12.9
|
Sempt
|
|
|
|
12.3
|
Altenerding
|
|
|
|
10.0
|
Aufhausen
|
|
|
|
6.4
|
St. Koloman
|
|
|
|
5.0
|
Wifling
|
|
|
|
3.3
|
Ottenhofen
|
|
|
|
|
|
|
|
|
0.0
|
Markt Schwaben
|
(508 m)
|
|
|
|
7.6
|
Walpertskirchen Link
|
|
|
|
|
|
|
|
|
0.0
|
to Mühldorf
|
|
|
|
|
|
|
|
|
Source: German railway atlas[1]
| |
|
The Erding ring closure (German: Erdinger Ringschluss) is a project to build a 30.2-kilometre (18.8 mi) long, double-track railway that is planned to run from Freising via Munich Airport to Erding.