Fangshan line

Fangshan line
A Fangshan line train leaving Suzhuang station
Overview
Other name(s)M25 North (planned name)
Line 25 North
StatusOperational
LocaleFengtai and Fangshan districts
Beijing
Termini
Stations16
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corporation Limited
Depot(s)Yancun
Rolling stock6-car Type B (BD24)
Daily ridership102,600 (2014 Avg.)
132,100 (2014 Peak)[1]
History
Opened30 December 2010; 13 years ago (2010-12-30)
Technical
Line length31.8 km (19.8 mi)
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrification750 V DC third rail
Route map

Dongguantounan
Shoujingmao
Left arrow inner – outer Right arrow
Zaoyu ditch
Huaxiang Dongqiao
Ma'cao river
Baipenyao
connects Line 9
Guogongzhuang
connects line 9 depot Right arrow
Dabaotai
Several railways near Fengtai West railway station crossing
Daotian
Changyang
Xiaoqing river
Libafang
Yaba river
Guangyangcheng
Liangxiang Univ. Town North
Liangxiang Univ. Town
Liangxiang Univ. Town West
Liangxiang Nanguan
Ciwei river
Suzhuang
Yancun depot
planned through trains via Yanfang line
Yancundong

The Fangshan Line of the Beijing Subway (Chinese: 北京地铁房山线; pinyin: běijīng dìtiě fángshān xiàn) is a rapid transit line in western Beijing that runs from Yancundong in Fangshan District north and east to Dongguantounan in Fengtai District. The line is 31.8 km (19.8 mi). It is mainly elevated, including 10 elevated stations and 6 underground stations.[2] It allows residents of Beijing's western suburbs to connect to the rest of the Beijing Subway network. Fangshan line's color is orange.

It was opened on December 30, 2010. An expansion of the line came on December 30, 2017, with the opening of the one-station western extension to Yancundong. The line was extended further north from Guogongzhuang station to the southwest corner of the Third Ring Road. The extension is 5.25 km (3.26 mi) in length and it is fully underground.[3][4] The northern extension opened on December 31, 2020.[5]

  1. ^ 2014年4月30日综合交通总体运行情况. 北京市交通信息中心 北京市交通运行监测调度中心. 2014-05-01. Archived from the original on 2014-05-02. Retrieved 2014-05-02.
  2. ^ 北京地铁房山线规划方案公布 设车站11座 Mar. 24, 2010 (Chinese)
  3. ^ "房山线将延伸"牵手"多条地铁". 2015-11-19.
  4. ^ "北京轨道交通房山线北延四环路站通过结构验收". 2018-03-12. Archived from the original on 2020-08-08. Retrieved 2021-10-05.
  5. ^ "明日起,地铁房山线北延、16号线中段和有轨电车T1线开通试运营!". 2020-12-30.