Genting Skyway

Genting Skyway
云顶缆车
Cabin view from upper station.
Overview
StatusLimited Service
SystemGondola lift
LocationGenting Highlands, Pahang, Malaysia
TerminiGohtong Jaya, Selangor
Highlands Hotel, Genting Highlands
No. of stations2
Open1 February 1997; 27 years ago (1997-02-01) (open to the public)[1]
21 February 1997; 27 years ago (1997-02-21) (official launch)[2]
Operation
Carrier capacitymaximum of 8 adult passengers per cabin, more than 2,000 people per hour
Trip duration15 min
Technical features
Aerial lift typeCable car
Line length3,380 m (11,090 ft)
Operating speed6 metres per second

Genting Skyway is a gondola lift connecting Gohtong Jaya and Resort Hotel in Genting Highlands, Selangor, Malaysia. Its lower station at Gohtong Jaya township, located approximately 51 kilometres (32 mi) northeast of Kuala Lumpur, comprises a 5-storey station building and a 10-storey car park[3] while its upper station is located at the Highlands Hotel.[3] It was opened to the public on 1 February 1997 [1] and officially opened by the fourth Prime Minister of Malaysia, Mahathir Mohamad on 21 February 1997.[2]

Completed in January 1997 and costing RM 128 million to build,[3] the Genting Skyway is one of the two aerial lines serving Genting Highlands and helps to ease the traffic congestion at Genting Highlands[3] especially during peak seasons.[4] At launch, Genting Skyway was the longest cable-car system in South East Asia[4] and also the most advanced and fastest monocable car system in the world, travelling up to 21.6 km/h.[4]

Genting Skyway can carry more than 2,000 people per hour[2] with 8 passengers per gondola.[1] At the maximum speed of 6 metres per second (21.6 km/h), the 3.38-kilometre (2.10 mi) joustations.the mountain peak takes approximately 15 minutes, depending on the weather. The system was designed by Leitner Ropeways.[4]

The 2 x 640 kW power of the main drive and the 54 mm diameter solid cable wire is among the most powerful and strongest monocable gondola installation in the world.[citation needed] The system, equipped with high-tech electronic equipment[citation needed], was built in accordance with stringent Swiss regulations[1] and it has a double safety circuit free from all faults.[4]

The foundation used for the pylons is of the "Hang-dug Caisson" type. Each pylon is founded on four Caissons measuring 1.2 metres in diameter, socketed down to bedrock. The average depth of the Caissons is about 40 m (135 feet) and each group of four Caissons piles can take a vertical load of 4,000 tonnes against the maximum vertical load of 150 tonnes from the cable car system. The Caissons method is about the safest and strongest foundation in existence, designed specifically for hilly terrain. Each pylon is accessible via rescue tracks on the ground, whilst each gondola is equipped with radio communication equipment from the stations.

  1. ^ a b c d "Up Genting Highlands — in just 11 minutes". The Straits Times. Bernama, New Straits Times. 23 February 1997. Retrieved 23 October 2024.
  2. ^ a b c "Skyway date". The Straits Times. New Straits Times. 21 February 1997. Retrieved 23 October 2024.
  3. ^ a b c d "Genting's cable cars make debut". The Straits Times. Bernama. 2 February 1997. Retrieved 23 October 2024.
  4. ^ a b c d e "Speedy rail and cable-car link from new KL airport to Genting". The Straits Times. Bernama. 9 March 1997. Retrieved 23 October 2024.