Emden at the Blohm+Voss shipyard in Hamburg, 2023
| |
History | |
---|---|
Germany | |
Name | Emden |
Namesake | Emden |
Ordered | September 2017 |
Builder | Lürssen-Werft, Bremen |
Cost | €400 million |
Laid down | 30 January 2020 |
Commissioned | Expected, 2025 |
Identification | Pennant number: F266 |
Status | Under construction |
General characteristics | |
Type | Braunschweig-class corvette |
Displacement | 1,840 tonnes (1,810 long tons) |
Length | 89.12 m (292 ft 5 in) |
Beam | 13.28 m (43 ft 7 in) |
Draft | 3.4 m (11 ft 2 in) |
Propulsion | 2 MTU 20V 1163 TB 93 diesel engines producing 14.8MW, driving two controllable-pitch propellers. |
Speed | 26 knots (48 km/h; 30 mph) |
Range | 4,000 nmi (7,400 km) at 15 kn (28 km/h; 17 mph)[1] |
Endurance | 7 days; 21 days with tender |
Complement | 65 : 1 commander, 10 officers, 16 chief petty officers, 38 enlisted |
Sensors and processing systems | |
Electronic warfare & decoys |
|
Armament |
|
Aircraft carried | Helicopter pad and hangar for two Saab Skeldar |
Emden (F266) is the seventh ship of the Braunschweig-class corvette of the German Navy.