Green Line (Chennai Metro)

Green Line
A metro train on the Green line entering Koyambedu station
Overview
StatusFully Operational
LocaleChennai
Termini
Connecting linesOperational (2):
Green Line  Chennai MRTS 
Upcoming (3):
Purple Line Red Line Orange Line
Stations17
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
Depot(s)Koyambedu
Rolling stockAlstom
History
Opened25 September 2015 (2015-09-25)
Technical
Line length22 km (14 mi)
Number of tracks2
Character9.7 km (6.0 mi) Underground
12.3 km (7.6 mi) Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed80 km/h (50 mph)
Route map

M.G.R Central
Egmore
Nehru Park
Kilpauk Medical College Purple Line
Pachaiyappa's College
Shenoy Nagar
Anna Nagar East
Anna Nagar Tower
Thirumangalam Red Line
NH4-IN.svg NH 4: EVR Periyar Salai
Koyambedu depot
Koyambedu Red Line
Jayalalithaa CMBT
Arumbakkam
Vadapalani Orange Line
Ashok Nagar
Ekkattuthangal
Arignar Anna Alandur
St. Thomas Mount

The Green Line is one of the two operational lines of Chennai Metro apart from the Blue line. The line stretches from Chennai Central to St. Thomas Mount, covering a distance of 22 km (14 mi). The line consists of 17 stations out of which nine stations are underground and the rest are elevated or on ground level.

Planning for the metro started in 2007-08 with the construction commencing in February 2009. Testing began in 2014, and the Commissioner of Metro Rail Safety approved the operations in January 2015. On 29 June 2015, commercial operations started between Alandur and Koyambedu stations on the green line with the first underground section between Thirumangalam to Nehru Park operational on 14 May 2017, which was later extended to Chennai Central on 25 May 2018.