Hillcrest Complex | |
---|---|
General information | |
Location | 1138 Bathurst Street[1] Toronto, Ontario Canada |
Coordinates | 43°40′32″N 79°25′04″W / 43.67556°N 79.41778°W |
Operated by | Toronto Transit Commission |
Construction | |
Structure type | Maintenance shops; administration offices; Transit Control Centre |
History | |
Opened | 1924 |
Hillcrest Complex,[2] the Toronto Transit Commission's largest facility, is responsible for most of the maintenance work on the system's surface vehicles, including heavy overhauls, repairs, and repainting. It is located adjacent to the intersection of Bathurst Street and Davenport Road. The site is also home to the TTC's Transit Control Centre, but the operational headquarters of the organization remains at the McBrien Building, at 1900 Yonge Street.
Hillcrest Complex occupies an area of about 13 hectares (32 acres) with a frontage of 270 m (890 ft) along Bathurst Street and 420 m (1,380 ft) along Davenport Road.[3]
Materials_and_procurement
was invoked but never defined (see the help page).Hillcrest Complex is located at 1138 Bathurst Street, consisting of approximately 32 acres (13 hectares), with approximate roadway frontages of 270 metres on Bathurst Street and 420 metres on Davenport Road.