General information | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Huazhuang Village, Liyuan Town, Tongzhou District, Beijing[1] China | ||||||||||||||
Coordinates | 39°51′19″N 116°41′21″E / 39.8553663°N 116.6891062°E | ||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||||||
Line(s) | Line 7 Batong line (through operation to Line 1) | ||||||||||||||
Platforms | 4 (2 island platforms) | ||||||||||||||
Tracks | 4 | ||||||||||||||
Construction | |||||||||||||||
Structure type | Underground | ||||||||||||||
Accessible | Yes | ||||||||||||||
History | |||||||||||||||
Opened | December 28, 2019 | ||||||||||||||
Services | |||||||||||||||
| |||||||||||||||
|
Huazhuang station[2] (Chinese: 花庄站; pinyin: Huāzhuāng zhàn) is a subway station on Line 7 and the Batong line (through operation to Line 1) of the Beijing Subway. It is located in Huazhuang Village in Liyuan Town in Tongzhou District.[1] It has a double-island platform. It is operated by Beijing Mass Transit Railway Operation Corporation Limited. The station was the eastern terminus for both lines until Universal Resort station opened on August 26, 2021.
花庄站。位于通州区梨园镇花庄村