Hyderabad Airport Metro Express

Hyderabad Airport Express Metro
Overview
Other name(s)Corridor IV
StatusStopped
OwnerHyderabad Metro
LocaleHyderabad, India
Termini
Stations10
WebsiteHAML
Service
TypeAirport Express Train
SystemRapid Transit
Operator(s)Hyderabad Airport Metro Limited (HAML)
History
Planned openingon hold
Technical
Line length31 km (19 mi)
CharacterUnderground, and Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Raidurg Subway interchange Blue Line
Biodiversity Junction
Nanakramguda Junction
Puppalaguda
Narsingi
TS Police Academy / Manchirevula
Rajendranagar / Satamrai
Shamshabad
Airport Cargo
RGIA Terminal Rajiv Gandhi International Airport

The Hyderabad Airport Express Metro or Corridor IV was a planned Hyderabad Metro line from Raidurg metro station to Rajiv Gandhi International Airport.[1][2] The total length of the line is 31 km (19 mi).[3] Hyderabad Airport Express Metro is fully funded by Government of Telangana through the engineering, procurement and construction (EPC) mode.[4] As of December 2023, Union Government is yet to provide in principle approval for this project.[5]

  1. ^ "From start to finish, Hyderabad Airport Metro expected to be smooth affair". 9 December 2022.
  2. ^ Geetanath, V. (12 October 2023). "Wait for next phase of Hyderabad Metro rail gets longer". The Hindu.
  3. ^ Geetanath, V. (29 November 2022). "Airport Express Metro to be elevated with 2.5-km underground stretch near RGIA". The Hindu.
  4. ^ Geetanath, V. (31 May 2023). "After many twists and turns, Hyderabad metro's second phase finally in motion". The Hindu.
  5. ^ "Centre yet to give in principle approvals for next phase of metro rail". The Hindu. 26 December 2023.