Indore-Dewas-Ujjain section

Indore-Dewas-Ujjain section
Overview
StatusPartially Operational
OwnerIndian Railway
LocaleMadhya Pradesh
Termini
Service
SystemWestern Railway
Operator(s)Ratlam railway division
Technical
Track length79 km (49 mi)
Number of tracks2
Track gauge5 ft 6 in (1,676 mm) broad gauge
ElectrificationYes
Operating speed100 km/h (62 mph)

The Indore-Dewas-Ujjain section of the Western Railway Zone is a partially operational public transit system in the state of Madhya Pradesh. It connects Indore Jn with Ujjain Jn on Ujjain-Bhopal section and Dewas Jn on Dewas-Maksi section. It is currently operational as a single-track electrified railway line, and is undergoing doubling.[1]

The tentative time of completion of the project is slated to be March 2023. The work is being done by Ratlam railway division of Western Railways.[2]

  1. ^ "Project Summary: INDORE-DEWAS-UJJAIN (80 KMS)". Ministry of Statistics and Programme Implementation (MOS&PI), Govt. of India. Online Computerised Monitoring System (OCMS). 11 July 2022. Retrieved 16 September 2022.
  2. ^ "Indore: Railways has fixed time limit for completion of projects: DRM". The Free Press Journal. Indore, MP. 6 April 2022. Retrieved 16 September 2022.