Integrated Electronic Control Centre

IECC trackerball and associated buttons used for route setting

The Integrated Electronic Control Centre (IECC) was developed in the late 1980s by the British Rail Research Division for UK-based railway signalling centres, although variations exist around the world. It is the most widely deployed VDU based signalling control system in the UK, with over 50 workstations in control centres that manage many of the most complex and busy areas of the network.[when?]

IECC consists of a number of operator’s workstations with VDU/LCD displays which depict the control area and is semi-automatic using Automatic Route Setting (ARS) – a computer-based route setting system driven from a pre-programmed timetable database. ARS can also handle severely disrupted service patterns and assist the signaller in the event of train or infrastructure failures.

IECCs were developed as an alternative to the traditional switch or button panel control, which in turn replaced mechanical lever frames. From the start, they controlled Solid State Interlockings (SSIs), a software version of the traditional relay interlocking, but existing relay interlockings may also be controlled from an IECC. The system can control as many miles of track as required, but typically around 50–100 miles.

Recently, PC-based control systems, similar to the IECC have been developed and are sold by various signalling contractors, e.g. Westinghouse Rail Systems WESTCAD.