Istanbul Waste Power Plant | |
---|---|
Official name | İBB Atık Yakma ve Enerji Üretim Tesisi |
Country | Turkey |
Location | Işıklar Mah., Eyüp, Istanbul |
Coordinates | 41°13′30″N 28°48′54″E / 41.22500°N 28.81500°E |
Status | Operational |
Construction began | 16 September 2017 |
Commission date | November 26, 2021 |
Owner(s) | Istanbul Metropolitan Municipality |
Operator(s) | İstanbul Environmental Management Co. (İSTAÇ) |
Thermal capacity | 175 MW⋅h |
Power generation | |
Nameplate capacity | 78 MW⋅h |
Istanbul Waste Power Plant (Turkish: İBB Atık Yakma ve Enerji Ürestim Tesisi) is a waste-to-energy facility in the Eyüp district of Istanbul near the Odayeri landfill,[1] Turkey, using waste incineration. Opened in 2021 it is owned by the Istanbul Metropolitan Municipality (İBB) and operated by İstanbul Environmental Management Co. (İSTAÇ).[2] It is Turkey's first power plant of this type.[3] Project development started in 2011 with a grant from the United States Trade Development Agency (USTDA) which involved first a Definitional Mission and subsequently a detailed Feasibility Assessment.[4][5]