Jayadeva Hospital metro station

Jayadeva Hospital
Namma Metro station
Side view of Under Construction of this metro station under Yellow Line and Pink Line of Namma Metro
General information
LocationJayadeva Junction, BHBCS Layout, BTM Layout Stage 2, Bengaluru, Karnataka 560076
Coordinates12°55′00″N 77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
Elevation29 m (95 ft) from Street Level (TBC)
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line Pink Line
Platforms  Side platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
  Side platform
Platform-3 → Kalena Agrahara
Platform-4 → Nagawara
Platform numbers (TBC)
Tracks4
Construction
Structure typeElevated, Double track x2
Platform levels4
Accessible(TBC)
Other information
Status  Final Stages before Operations
  Under Construction
History
Opening  25 January 2025; 2 months' time (25 January 2025) (TBC)
  December 2025; 12 months' time (December 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Ragigudda Yellow Line
(Operational around January 2025)
BTM Layout
towards Bommasandra
Tavarekere
towards Nagawara
Pink Line
(Operational around December 2025)
JP Nagar 4th Phase
Location
Map

Jayadeva Hospital is an upcoming double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line[1] of Namma Metro in Bangalore, India. This metro station will be the first multi-elevated interchange metro station in the Namma Metro network. This metro station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Guruppanpalya, Jayanagar and JP Nagar 3rd Phase.

As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[2] due to lots of trial runs along with more trainsets which are needed for commencement of operations.[3][4][5][6][7][8] Meanwhile, the elevated section of Pink Line covering a distance of 7.5km (Kalena Agrahara - Tavarekere), is expected to be operational around December 2025 [9] instead of September 2025. [10][11][12][13][14][15]

  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  3. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  4. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  5. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  6. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
  7. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
  8. ^ "Titagarh to supply the first train for Bengaluru metro's Electronics City corridor in August 2024". Moneycontrol. 10 May 2024. Retrieved 1 June 2024.
  9. ^ "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  10. ^ Bureau, The Hindu (4 August 2024). "Namma Metro's Pink line likely to open in phases". The Hindu. ISSN 0971-751X. Retrieved 7 August 2024. {{cite news}}: |last= has generic name (help)
  11. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  12. ^ "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  13. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  14. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
  15. ^ "Bengaluru Metro's Pink Line to be operational by 2025, says DK Shivakumar". Moneycontrol. 8 February 2024. Retrieved 1 June 2024.