Jimenqiao station

Jimenqiao

蓟门桥
Beijing Subway
Construction site (April 2024)
General information
LocationIntersection of North Third Ring West Road, North Third Ring Middle Road and Xitucheng Road
Boundary of Beitaipingzhuang Subdistrict and Huayuanlu Subdistrict, Haidian District, Beijing
China
Coordinates39°57′59″N 116°20′57″E / 39.966304°N 116.349137°E / 39.966304; 116.349137
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 12
     Changping line
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
OpenedDecember 2024; 1 month's time (2024-12) (Both lines)
Location
Jimenqiao is located in Beijing
Jimenqiao
Jimenqiao
Location in central Beijing

Jimenqiao station[1][2][3] (Chinese: 蓟门桥站; pinyin: Jìménqiáo zhàn) is an interchange station under construction on Line 12 and Changping line of the Beijing Subway.[4][5] The station is expected to open at the end of December 2024, and will be the southern terminus of Changping line.

  1. ^ "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
  2. ^ "轨道交通17号线、19号线一期、昌平线南延一期工程沿线车站命名预案" (PDF). 北京市规划和自然资源委员会. 2021-07-19. Retrieved 2023-01-18.
  3. ^ "地名公告". Archived from the original on 2022-06-11. Retrieved 2023-01-18.
  4. ^ "昌平线南延+16号线南段!北京两条地铁新线最后"冲刺"". 北京日报客户端. 2022-12-23. Retrieved 2023-01-18. 昌平线南延北起清河站,南至西土城站,线路全长10.6公里,设车站6座:朱房北站(暂缓开通)、清河小营桥站、学知园站、六道口站、学院桥站、西土城站
  5. ^ "地铁昌平线南延线进入按图空载试运行". cnr.cn. 2022-11-23. Archived from the original on 2022-11-23. Retrieved 2023-01-18.