General information | |||||
---|---|---|---|---|---|
Location | Intersection of North Third Ring West Road, North Third Ring Middle Road and Xitucheng Road Boundary of Beitaipingzhuang Subdistrict and Huayuanlu Subdistrict, Haidian District, Beijing China | ||||
Coordinates | 39°57′59″N 116°20′57″E / 39.966304°N 116.349137°E | ||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||
Line(s) | Line 12 Changping line | ||||
Platforms | 4 (2 island platforms) | ||||
Tracks | 4 | ||||
Construction | |||||
Structure type | Underground | ||||
Accessible | Yes | ||||
History | |||||
Opened | December 2024 | (Both lines)||||
|
Jimenqiao station[1][2][3] (Chinese: 蓟门桥站; pinyin: Jìménqiáo zhàn) is an interchange station under construction on Line 12 and Changping line of the Beijing Subway.[4][5] The station is expected to open at the end of December 2024, and will be the southern terminus of Changping line.
昌平线南延北起清河站,南至西土城站,线路全长10.6公里,设车站6座:朱房北站(暂缓开通)、清河小营桥站、学知园站、六道口站、学院桥站、西土城站