It has been suggested that this article be merged with Waltz & Reece Cut, Armstrong Cut, Bradbury Fill, Colby Cut, Lubber Run Fill, Vail Fill, Ramsey Fill, Pequest Fill, McMickle Cut (Lackawanna Cut-Off), Wharton Fill and Slateford Junction to Lackawanna Cut-Off. (Discuss) Proposed since September 2024. |
Jones Cut is one of the cuts on the Lackawanna Cut-Off railroad line in northwest New Jersey.
Located near milepost 64.8 in Blairstown Township, the cut was constructed between 1908 and 1911 by contractor Hyde, McFarlan & Burke. Some 578,000 cubic yards (442,000 m3) of fill material was removed by blasting with dynamite or other methods. Jones Cut is located on a tangent (straight) section of track, permitting speeds of 80 mph (129 km/h). Blairstown Station sits within the cut.[1]
Jones Cut is named for William Jones, who was the principal owner of the land that was acquired for this cut.[2]