Jurong Lake District MRT station

 CR19 
Jurong Lake District
裕廊湖区[1]
ஜூரோங் லேக் வட்­டா­ரம்[2]
Future Mass Rapid Transit (MRT) station
Future site of the Jurong Lake District station in the future Jurong Lake District
General information
Coordinates1°19′38″N 103°44′21″E / 1.327245°N 103.739080°E / 1.327245; 103.739080
Owned byLand Transport Authority
Line(s)
Connections JE6  Jurong Town Hall[3]
Construction
Structure typeUnderground
AccessibleYes
History
Opening2032; 8 years' time (2032)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
West Coast Cross Island Line
Future service
Terminus
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Jurong Lake District
Jurong Lake District station in Singapore

Jurong Lake District MRT station is a future underground Mass Rapid Transit (MRT) station on the Cross Island line (CRL) located in Jurong East, Singapore. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.

  1. ^ "跨岛线第二阶段将有六个地铁站 预计2032年竣工". 早报 (in Chinese). 20 September 2022. Archived from the original on 21 September 2022. Retrieved 20 September 2022.
  2. ^ "குறுக்குத் தீவு ரயில்பாதையின் 2ஆம் கட்டம் 2032ல் திறப்பு". tamilmurasu (in Tamil). 21 September 2022. Archived from the original on 21 September 2022. Retrieved 21 September 2022.
  3. ^ "Response by Senior Minister of State for Transport, Dr Amy Khor to Adjournment Motion on "Realising the Vision of a 45-Minute City Under the Land Transport Master Plan 2040 in the West of Singapore"". mot.gov.sg. 15 October 2024. Retrieved 21 November 2024.