Jurong Region MRT line

Jurong Region Line
Logo of Jurong Region Line
Construction site
Overview
Native nameMalay: Laluan Daerah Jurong
Chinese: 裕廊区域线
Tamil: ஜூரோங் வட்டாரப் பாதை
StatusUnder construction
OwnerLand Transport Authority
LocaleSingapore
Termini
Stations24
Service
TypeRapid transit
SystemMass Rapid Transit (Singapore)
Services3
Depot(s)Tengah
Rolling stockHyundai Rotem J151
History
Planned opening
  • 2027 (2027) (Stage 1)
  • 2028 (2028) (Stage 2)
  • 2029 (2029) (Stage 3)
Technical
Line length24 km (15 mi)
CharacterFully elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrification750 V DC third rail
Route map

 JS1  NS4  BP1 
Choa Chu Kang
Bukit Panjang LRT
to Fajar via Petir/Senja
 JS2 
Choa Chu Kang
West
 JS3 
Tengah
Tengah Plantation
 JE1 
 JS4 
Hong Kah
Tengah Park
 JE2 
Bukit Batok West
 JE3 
 JS5 
Corporation
Toh Guan
 JE4 
 JS6 
Jurong West
 JE5  EW24  NS1 
 JS7 
Bahar Junction
Jurong East
 JW1 
Gek Poh
Jurong Town Hall
 JE6 
 JW2 
Tawas
 JW3 
Nanyang Gateway
Pandan Reservoir
 JE7 
 JW4 
Nanyang Crescent
 EW27 
Boon Lay
 JS8 
Peng Kang Hill
Stabling Facility
 JW5 
Peng Kang Hill
Enterprise
 JS9 
Tukang
 JS10 
Jurong Hill
 JS11 
Jurong Pier
 JS12 

The Jurong Region Line (JRL) is a Mass Rapid Transit (MRT) line under development in Singapore. It will serve the western parts of the country, particularly the new town of Tengah and its surrounding areas. First envisioned as a Light Rail Transit (LRT) line in 2001, it was put on hold throughout the 2000s before its current iteration as a MRT line was confirmed in 2013. The line is set to open in stages from 2027 to 2029.[1][2] It will be the first MRT line to be fully elevated, and the fifth MRT line to be completely automated and driverless.

The JRL will have 24 stations, serving Choa Chu Kang in the north, Jurong Pier in the south, Peng Kang Hill in the west and Pandan Reservoir in the east. A West Coast extension to Haw Par Villa station, which is a part of the Circle Line, is under consideration. The line is coloured teal on the rail map. It will be the seventh MRT line in Singapore. It will use J151 trains supplied by Hyundai Rotem in a three to four-car formation, and a moving block signalling system supplied by Siemens.

  1. ^ "Jurong Region Line, Singapore's 7th MRT line, to open in phases from 2026". Channel NewsAsia. 9 May 2018. Archived from the original on 9 May 2018. Retrieved 9 May 2018.
  2. ^ "Jurong Region Line to open from 2026 in three phases". The New Paper. 10 May 2018. Archived from the original on 12 May 2018. Retrieved 12 May 2018.