Kashiwazaki-Kariwa Nuclear Power Plant

Kashiwazaki-Kariwa Nuclear Power Plant
Aerial view, units 5, 6, and 7
Map
CountryJapan
Location
  • Kashiwazaki-Kariwa region
Coordinates37°25′42″N 138°36′06″E / 37.42833°N 138.60167°E / 37.42833; 138.60167
StatusOut of service
Construction beganJune 5, 1980 (1980-06-05)
Commission dateSeptember 18, 1985 (1985-09-18)
Owner(s)
Operator(s)Tokyo Electric Power Company
Cooling sourceSea of Japan
Power generation
Units operational5 × 1,067 MW
2 × 1,315 MW
Nameplate capacity7,965 MW
Capacity factor0%
Annual net output0 GW·h
External links
Websitewww.tepco.co.jp/nu/kk-np/index-j.html
CommonsRelated media on Commons

The Kashiwazaki-Kariwa Nuclear Power Plant (柏崎刈羽原子力発電所, Kashiwazaki-Kariwa genshiryoku-hatsudensho, Kashiwazaki-Kariwa NPP) is a large, modern (housing the world's first advanced boiling water reactor or ABWR) nuclear power plant on a 4.2-square-kilometer (1,000-acre) site.[1] The campus spans the towns of Kashiwazaki and Kariwa in Niigata Prefecture, Japan, on the coast of the Sea of Japan, where it gets cooling water. The plant is owned and operated by Tokyo Electric Power Company (TEPCO), and it is the largest nuclear generating station in the world by net electrical power rating.

On 16 July 2007, the Chūetsu offshore earthquake took place, with its epicenter located only 19 km (12 mi) from the plant. The earthquake registered Mw 6.6, ranking it among the strongest earthquakes to occur in the immediate range of a nuclear power plant.[1] This shook the plant beyond design basis and initiated an extended shutdown for inspection, which indicated that greater earthquake-proofing was needed before the operation could be resumed. The plant was completely shut down for 21 months following the earthquake. Unit 7 was restarted after seismic upgrades on 19 May 2009, followed later by units 1, 5, and 6. (Units 2, 3, and 4 were not restarted by the time of the March 2011 earthquake.)

The four restarted and operating units at the plant were not affected by the 11 March 2011 earthquake, but thereupon all units were shut down to carry out safety improvements. TEPCO regained permission to restart units 6 and 7 from the Nuclear Regulation Authority (NRA) in 2017,[2] but throughout 2023, all units remained idle. In December 2023, the NRA finally approved the reloading of fuel at the plant, citing improvements in the safety management system.[3] As of 2024, TEPCO is seeking permission from local authorities to restart the plant again.

  1. ^ a b TEPCO Official Press Release (Japanese). First in Japan – Use of the Full Area for Power Plant Buildings, Reinforced Concrete R&D, and Waste Incinerator Building Archived 21 March 2011 at the Wayback Machine. 25 July 2002.
  2. ^ "NRA lifts ban on Kashiwazaki-Kariwa fuel activities". World Nuclear News. 2 January 2024.
  3. ^ Cite error: The named reference ban-lifted was invoked but never defined (see the help page).