Kepong Baru MRT station

 PY10  Kepong Baru
Rapid KL Logo | MRT station
General information
Other namesChinese: 甲洞卫星市站
LocationJalan Kepong, Laman Rimbunan, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
Malaysia
Coordinates3°12′43″N 101°38′53″E / 3.211890°N 101.648040°E / 3.211890; 101.648040
Owned byMRT Corp
Operated byRapid Rail
Line(s)12 Putrajaya
Platforms1 island platform
Tracks2
Construction
ParkingAvailable
AccessibleYes
Other information
StatusOperational
Station code PY10 
History
Opened16 June 2022; 2 years ago (2022-06-16)
ElectrifiedYes
Services
Preceding station Following station
Metro Prima Putrajaya Line Jinjang

Kepong Baru MRT station is an elevated Mass Rapid Transit (MRT) station in Kepong, Kuala Lumpur, Malaysia. Serving the Putrajaya Line, the station is located along Jalan Kepong near the junction with Jalan Api Api 1.

The station began operations on 16 June 2022 as part of Phase One operations of the Putrajaya Line.[1] Like the other elevated stations on the line, Kepong Baru station will have a Serambi-style design with the Japanese zen designs.[2] The station is designed by Ong&Ong.[3]

  1. ^ Wahab, Farid (16 June 2022). "First Putrajaya MRT stretch opens today". The Star. Retrieved 16 June 2022.
  2. ^ "Stations".
  3. ^ "MRT Putrajaya Line, Malaysia". Ong & Ong. Retrieved 16 December 2022.