CC30
Keppel 吉宝 கெப்பல் | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
General information | |||||||||||
Location | 51 Keppel Road Singapore 099423[1] | ||||||||||
Coordinates | 1°16′12″N 103°49′52″E / 1.2701°N 103.8310°E | ||||||||||
Operated by | SMRT Trains Ltd (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 1 | ||||||||||
Parking | No | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2026 | ||||||||||
Electrified | Yes | ||||||||||
Previous names | Keppel Harbour, Keppel Port[2] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Keppel MRT station is a future underground Mass Rapid Transit (MRT) station on the Circle line, located in Bukit Merah planning area, Singapore. This station is part of Stage 6 of the Circle line (CCL6) which will "close the circle" between the HarbourFront and Marina Bay stations. The station will be located along Keppel Road, near to the Keppel Harbour. Slated for completion by 2026, Keppel station will serve the upcoming Greater Southern Waterfront.
First announced in 2015, construction of the station began in 2017. The station was to be opened in 2025 along with the other CCL6 stations, but was delayed to 2026 due to the COVID-19 pandemic in Singapore.[3]