General information | |||||
---|---|---|---|---|---|
Location | Anggadita, Klari, Karawang Regency West Java Indonesia | ||||
Coordinates | 6°21′00″S 107°20′42″E / 6.35°S 107.345°E | ||||
Elevation | +23 m (75 ft) | ||||
Owned by | Kereta Api Indonesia | ||||
Operated by | Kereta Api Indonesia | ||||
Line(s) | Rajawali–Cikampek | ||||
Platforms | 1 side platform 3 island platforms | ||||
Tracks | 4 | ||||
Construction | |||||
Structure type | Ground | ||||
Parking | Available | ||||
Accessible | Available | ||||
Other information | |||||
Station code | KLI | ||||
Classification | Class III[1] | ||||
History | |||||
Opened | 27 December 1902[2] | ||||
|
Klari Station (KLI) is a class III railway station located in Anggadita, Klari, Karawang Regency, West Java, Indonesia. The station, which is located at an altitude of +23 meters, is included in the Operation Area I Jakarta.
At the station a cement warehouse was also built to serve the loading and unloading of the Bima cement train from the Kretek Station which began operating on 2 November 2015.[3]