Legacy Trail (Florida)

Legacy Trail
Legacy Trail near State Road 681 overpass
Length18.5 miles (29.8 km)[1]
LocationSarasota County, Florida
EstablishedDecember 21, 2004[2]
Trailheads
UseShared-use for walking and cycling
SeasonYear round
MonthsYear round
SightsPayne Park, Oscar Scherer State Park, Venice Train Depot
HazardsWeather, at-grade pedestrian crossing at vehicular thoroughfares
SurfaceAsphalt
Right of waySeminole Gulf Railway[1]
Maintained bySarasota County
Websitescgov.net/LegacyTrail
Trail map
Map
Legacy Trail highlighted in green

The Legacy Trail is an 18.5-mile (29.8 km) multi-use recreational rail trail connecting Sarasota and Venice, Florida. It runs along a former portion of the Seminole Gulf Railway corridor (most of which was originally a Seaboard Air Line Railroad corridor). The trail runs from the Historic Venice Train Depot to Fruitville Road in Sarasota.[3] The original segment of the trail from Venice to Palmer Ranch opened in 2008 and it was extended to central Sarasota in 2022.

  1. ^ a b "Historical Overview of The Legacy Trail". Sarasota County Government. March 22, 2018. Archived from the original on April 7, 2018. Retrieved July 31, 2019.
  2. ^ Brown, Carolyn; Kurant, Lin (August 29, 2017). "Acquisition of Land for The Legacy Trail Extension" (PDF) (Report). Sarasota County Government. General Services. Archived from the original on April 7, 2018. Retrieved September 9, 2021.
  3. ^ "Sarasota County Trails Plan". Sarasota County Government. Archived from the original on April 5, 2018. Retrieved April 4, 2018.