Line 10 (Chongqing Rail Transit)

Line 10
A train of Chongqing Rail Transit Line 10
Overview
Native name重庆轨道交通10号线
StatusOperational
Line number10
LocaleChongqing, China
Termini
Stations23
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017; 6 years ago (2017-12-28)
Technical
Line length43.26 km (26.88 mi) (operational)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Lanhualu
Lanhualu depot
Nanhu
Wanshoulu
Nanping
Houbao
Qixinggang
Chongqing People's Auditorium
Zengjiayan
Liyuchi
Hongtudi
Longtousi Park
Chongqing N. Station
South Square
 
Chongqing N. Station
North Square
Bus interchange Chongqing North railway station 4
Minxinjiayuan
Sanyawan
Shangwanlu
Huanshan Park
Changhe
Zhujiawan depot
Jiangbei Airport
Terminal 3
Jiangbei Airport
Jiangbei Airport
Terminal 2
Jiangbei Airport Bus interchange 3
Yubei Square
Lushan
Central Park East
Central Park
Central Park West
Line 6
International Expo branch
to Lijia
Yuelai
Wangjiazhuang depot
Wangjiazhuang
Line 6
International Expo branch
to Shaheba

Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017.[1] Rapid trains started operating on Line 10 in June 2020.[2]

The trains on Line 10, which links Jiangbei Airport and Chongqing North railway station, are equipped with a luggage rack on each car.[3]

Interior of a Line 10 train
Interior of a Line 10 train
Luggage rack
Luggage rack
  1. ^ "重庆市主城形成多层次立体交通体系". May 16, 2017.
  2. ^ "轨道交通将跨线运行 唐家沱到重图不到40分钟-新华网". m.xinhuanet.com. Retrieved August 27, 2020.
  3. ^ Jiang, Yan; Hu, Jie (December 18, 2017). 轨道也将有"超车道"! 五号线十号线将分"快慢车"-上游新闻 汇聚向上的力量. Chongqing Morning Paper (in Chinese (China)). Retrieved February 24, 2018.