Line 11 (Beijing Subway)

Line 11
Line 11 train leaving Jin'anqiao station
Overview
Other name(s)M11 (planned name)
Winter Olympic Branch Line (nickname for Phase 1)
StatusOperational
Termini
Stations4
Service
TypeRapid transit
SystemBeijing Subway
Rolling stockType A, 4-car / 6-car[1]
History
Opened31 December 2021; 2 years ago (2021-12-31)[2]
Technical
Line length4.2 km (2.6 mi)[3][4]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)[5]
Route map

Moshikou
Jin'anqiao
Beixin'an
Xinshougang (Shougang Park)
extension to Beijing West railway station and Lize Shangwuqu

Line 11 of the Beijing Subway (Chinese: 北京地铁11号线; pinyin: běijīng dìtiě shíyī hàoxiàn) is a rapid transit line of the Beijing Subway.[6] The line opened between Jin'anqiao and Xinshougang (Shougang Park) on December 31, 2021,[2] and between Jin'anqiao and Moshikou on December 30, 2023.[7][8] Line 11's color is grapefruit.

  1. ^ "『北京』地铁11号线西段首列车下线". 2021-07-30.
  2. ^ a b "北京地铁11号线西段等轨道新线2021年开通" [Beijing Subway Line 11 West Section and other new metro lines to open in 2021]. 2021-01-08. Archived from the original on 2021-02-17.
  3. ^ Cite error: The named reference bii20191205 was invoked but never defined (see the help page).
  4. ^ Cite error: The named reference sd202002 was invoked but never defined (see the help page).
  5. ^ "北京地铁冬奥支线规划来了!全天运营18小时,更多细节披露". 2019-07-09.
  6. ^ "北京地铁11号线西段(冬奥支线)01标工程正式开工". 2019-11-14.
  7. ^ "地铁17号线北段等三条地铁线(段)开通试运营" (in Chinese). Beijing Municipal Commission of Transport. 2023-12-29. Retrieved 2023-12-29. 2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
  8. ^ "年底见!17号线北段和16号线剩余段开通筹备中~". mp.weixin.qq.com. Beijing MTR Corporation Limited. 2023-12-18. Retrieved 2023-12-19.