Line 11 (Guangzhou Metro)

Line 11
Overview
Other name(s)M11 (plan name)
Central District Loop Line (Chinese: 中心区环线)
StatusUnder Construction
OwnerCity of Guangzhou
TerminiLoop line (Terminal station: Chisha)
Stations31
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
History
OpenedTBA (Expected December 28th, 2024)
Technical
Line length43.2 km (26.8 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80km/h (Maximum)
Route map

Dajinzhong Lu
 12 
 12 
Guangzhou University of
Chinese Medicine
Shahe
 6 
Ziyuangang
 6 
 2 
Guangzhou Railway Station
Jingguang Rly & Guangshen Rly
 3 
 14 
Guangzhou East
Railway Station
 1  3 
 2  5 ( 14 )
Guangzhou
Railway Station
 5 
Longkouxi
 2 
South China
Normal University
 3 
Liuhua
 3  (After 2024  10 )
 8  ( 13 )
Caihongqiao
Huajing Lu
( 19 )
 13 
 21 
 5 
 5 
Zhongshanba
Tianhe Park
 21  ( 13 )
 5 
 5 
 6 
Ruyifang
Yuancun
 5 
Tram interchange  THZ1 
Shiweitang
 8 
 1 
Pazhou
 8 
 1 ( 22 )
Fangcun
 12 
 1 
Chisha
( 12 )
Dachongkou
 12 
Shachong
Longtan
 18 
Hedongdong
Datang
 3 
Diyuan
Shangchong
Yangang
Yijing Lu
Wufeng
( 10 )
Jiangtai Road
 2 
 2 
Line 11 drawn to scale

Line 11 of the Guangzhou Metro (Chinese: 广州地铁11号线; pinyin: Guǎngzhōu Dìtiě Shíyīhàoxiàn) is a rapid transit rail line under construction in Guangzhou. It will be a loop line around the city center, connecting Guangzhou railway station, Guangzhou East railway station, Pazhou, and Fangcun.[1]

  1. ^ 广州规划7条新线地铁 里程超500公里 [Guangzhou plans 7 new metro lines, total metro length to exceed 500 km] (in Chinese). Guangzhou Metro Daily. 2012-07-12. Archived from the original on 2016-03-03. Retrieved 2012-07-12.