Line 13 (Shenzhen Metro)

Line 13
Overview
Other name(s)Shiyan Line
(石岩线; 石岩線; shíyán xiàn)
StatusUnder construction
LocaleBao'an and Nanshan districts
Shenzhen, Guangdong
Stations16
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)MTR Corporation (Shenzhen)[1]
History
Planned openingDecember 2024; 1 month's time (2024-12) (Phase 1 South section)[2][3]
Technical
Line length22.5km
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead Line, 1,500 V DC
Operating speed100 km/h (62 mph)
Route map

Gongming North
Xiacun
Changchun Road
Gongming Square
Gongming South
Dongzhou Road
Gongming Depot
Yueliang Road
Fenghuang Town
Tongguan Road
6B to SIAT Right arrow
Guangmingcheng
Guangming Central Hospital
Up arrow Phase 2 (Northern Extension)
Phase 1 Down arrow
Shangwu
Shiyan
Luozu
Yingrenshi
Baiwang · HKU
Liuxiandong
Shigu
Xili railway station
Hi-Tech North
Hi-Tech Central
1 to Luohu Right arrow
Shenzhen University
Yuehaimen
Keyuan
Houhai
Talent Park
Neihu Stabling Yard
Shenzhen Bay Checkpoint
Up arrow Phase 1
Phase 2 (Southern Extension) Down arrow
Sunrise Amphitheatre
Opera House
Dongjiaotou

Line 13 of the Shenzhen Metro is one of the four new metro lines of the metro's Phase IV expansion under construction in the city of Shenzhen, Guangdong.[4][5] The Phase 1 South section between Shenzhen Bay Checkpoint and Hi-Tech Central or Shenzhen University is expected to open on December 2024,[2][3] with the rest of Phase 1 and the northern extension expected to be completed and operational in 2025, and the southern extension in 2026. The first phase of the line will be 23 km (14 mi) long and will use eight car type A trains with a maximum operating speed of 100 km/h (62 mph).[6] Like Line 4, Line 13 will be operated by MTR Corporation (Shenzhen).

  1. ^ "港铁咨询公司联合体中标深圳市轨道交通13号线公私合营项目". 2020-08-03.
  2. ^ a b 有我有料 (2023-12-21). "地铁官方发公告!深圳地铁13号线通车稳了". qq (in Simplified Chinese). Archived from the original on 2024-01-27. Retrieved 2024-02-18.
  3. ^ a b 李嘉耀; 鲁力 (2024-01-26). "深圳地铁13号线分两段通车,南段7站有望年内开通". southcn+. Archived from the original on 2024-01-27. Retrieved 2024-02-18.
  4. ^ "WORK ON 4 NEW METRO LINES TO START THIS YEAR". Shenzhen Daily. 9 February 2017. Retrieved 9 February 2017.
  5. ^ "Metro lines to connect with Dong guan and Hui zhou". The Nanfang. 11 December 2016. Retrieved 9 February 2017.
  6. ^ 深圳地铁12、13、14、16等5条线明天开工,5年建成. news.sina.com.cn. 9 January 2018. Retrieved 2018-03-07.