Line 19 | |
---|---|
19 | |
Overview | |
Other name(s) | M9 (planned name) |
Native name | 上海地铁19号线 |
Status | Under construction |
Locale | Baoshan, Jing'an, Hongkou, Pudong, Xuhui, Minhang Shanghai |
Termini |
|
Connecting lines | 2 4 6 7 8 9 10 11 12 13 14 15 18 20 23 |
Stations | 34 |
Website | www |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Operator(s) | TBA |
Depot(s) | Chengjiang Road depot Tieshan Road parking lot |
Rolling stock | Class A 6-car trains |
History | |
Planned opening | 2027 |
Technical | |
Track length | 46.2 km (28.7 mi) |
Number of tracks | 2 |
Character | Underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Operating speed | 80 km/h (50 mph) |
Line 19 is an under construction subway line on the Shanghai Metro. Its termini are planned to be Baoshan Railway Station and Hongjian Road. It is planned to be 46.2 km (28.7 mi) in length, with 34 stations. The line hopes to ease car congestion along Pudong South Road, as well as reduce crowding on the southern part of line 8, and the northern sections of lines 1 and 3.
The line was announced by the Municipal government in 2016 and is planned to finish construction between Baoshan Railway Station and Yierba Jinian Road in 2027, and the rest of the line in 2031.[1][2]