Line 1 (Beijing Subway)

Line 1
Overview
Other name(s)M1 (planned name)
Fuba line (Chinese: 复八线, for Fuxingmen to Sihuidong section)
StatusOperational
LocaleChaoyang, Dongcheng, Xicheng, Haidian, and Shijingshan districts
Beijing
Termini
Stations23 (not accounting for Batong Line, but including Gaobeidian)
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd.
Depot(s)Guchenglu, Sihui Depots[1][2]
Rolling stock6-car Type B (DKZ4, SFM04)
Daily ridership1,234,900 (2014 Avg.)[3]
1,536,900 (2014 Peak)[4][5]
History
OpenedJanuary 15, 1971; 53 years ago (1971-01-15)
Technical
Line length31.04 km (19.29 mi)[6]
CharacterUnderground, at-grade[a]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (maximum service speed)
Route map

101 Gaojing
102 Fushouling (under renovation, to be reopened 2023)
Yongding River diversion canal
103 Pingguoyuan (closed for renovation)
Gucheng depot
104 Gucheng
101 railway (for military purpose only)
105 Bajiao Amusement Park
106 Babaoshan
107 Yuquan Lu
108 Wukesong
109 Wanshou Lu
110 Gongzhufen
Left arrow outer – inner Right arrow
111 Military Museum
Yongding River diversion canal
112 Muxidi
Line 16 (out-of-system interchange)
113 Nanlishi Lu
connects Line 2
114 Fuxingmen
Left arrow outer – inner Right arrow
Line 19 crossing
115 Xidan
116 Tian'anmenxi
117 Tian'anmendong
118 Wangfujing
connects Line 5
119 Dongdan
120 Jianguomen
Left arrow inner – outer Right arrow
connects Line 2
121 Yong'anli
Line 17 (to be opened 2024)
122 Guomao
Left arrow inner – outer Right arrow
123 Dawang Lu
124 Sihui
Batong line (through operation to Line 1)
connects Batong line (through operation to Line 1) (for depot trains only)
Sihui depot
Through operation
with Batong line (through operation to Line 1)
125 Sihuidong
Batong line (through operation to Line 1)

Line 1 of the Beijing Subway (Chinese: 北京地铁1号线; pinyin: Běijīng dìtiě yīhào xiàn) is the oldest and one of the busiest lines of Beijing's mass transit rail network. Line 1 runs underneath Chang'an Avenue, the city's grand east–west thoroughfare, right through the heart of Beijing with stops on either side of Tiananmen Square. Line 1's color is dark red. Through operation with the Batong line started on August 29, 2021.[7]

  1. ^ Gao Yucai (高毓才) (1999). 建设中的北京地铁——地铁"复一八"线. Beijing: China Railways Press (中国铁道出版社). p. 13. ISBN 7-113-03381-4.
  2. ^ Pan Xiaojun (潘晓军) (2013). 北京地铁1号线运输能力挖掘研究. 交通运输系统工程与信息. 13 (4): 200–204.
  3. ^ 客流信息. Beijing Subway. Archived from the original on 2015-03-30. Retrieved 2015-03-20.
  4. ^ "Ridership". Sina. Retrieved 2012-05-03.[permanent dead link]
  5. ^ "Official Ridership". Beijing Subway. Archived from the original on 2012-05-02. Retrieved 2012-05-04.
  6. ^ "八通线与1号线贯通?年底见分晓". bjnews.com.cn. 2016-11-16.
  7. ^ Cite error: The named reference bjd20210825 was invoked but never defined (see the help page).


Cite error: There are <ref group=lower-alpha> tags or {{efn}} templates on this page, but the references will not show without a {{reflist|group=lower-alpha}} template or {{notelist}} template (see the help page).