Line 1 | |
---|---|
1 | |
Overview | |
Other name(s) | R1 |
Status | Under Construction |
Locale | Dongguan, Guangdong |
Termini | |
Stations | 21 (Phase 1) |
Service | |
Type | Rapid transit |
System | Dongguan Rail Transit |
Operator(s) | Dongguan Rail Transit Corporation, Limited (东莞市轨道交通有限公司) |
History | |
Opened | 2025 (Planned) |
Technical | |
Line length | 57.5 km (35.7 mi) (Phase 1)[1] |
Number of tracks | 2 |
Character | Underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 1 of the Dongguan Rail Transit, (Chinese: 东莞轨道交通1号线; pinyin: Dōngguǎn Guǐdào Jiāotōng Yī Hào Xiàn), is a rapid transit line under construction in Dongguan, Guangdong. Phase 1 of Line 1 connects Wanghong station in the North with Huangjiang Center station in the south.[1]
The Phase 1 of Line 1 in Dongguan will start construction in September 2018.[2] The five-station extension to Huangpu New Port station have not approved by National Development and Reform Commission and has no published timeline.
ndrc1
was invoked but never defined (see the help page).