Line 1 (Guangzhou Huangpu Tram)

Guangzhou Huangpu Tram Line 1
 THP1 
Overview
Native name广州黄埔有轨电车1号线
OwnerGuangzhou Development Zone Transport Investment Group
LocaleHuangpu District, Guangzhou, Guangdong
Stations19 (in operation)
20 (future)
Service
TypeTram
SystemGuangzhou Trams
Services1
Operator(s)Guangzhou Tram Co., Ltd.
Depot(s)Lingfu, Yuyan
History
Opened1 July 2020; 4 years ago (2020-07-01)[1]
Technical
Line length14.3 km (8.9 mi)[1]
Number of tracks2
CharacterAt-grade, elevated
Track gauge1,435 mm (4 ft 8+12 in)
Map of Guangzhou Huangpu Tram Line 1

Guangzhou Huangpu Tram Line 1 (Chinese: 广州黄埔有轨电车1号线) is a tram line serving the Huangpu District of Guangzhou. The initial section opened on 1 July 2020.[1] The remaining section opened on 28 December 2020. It is 14.3 km (8.9 mi) in length with 20 stations, currently 19 stations are operational.

  1. ^ a b c "官宣:黄埔有轨电车1号线示范段明天开通". 2020-06-30.