Guangzhou Huangpu Tram Line 1 | |
---|---|
THP1 | |
Overview | |
Native name | 广州黄埔有轨电车1号线 |
Owner | Guangzhou Development Zone Transport Investment Group |
Locale | Huangpu District, Guangzhou, Guangdong |
Stations | 19 (in operation) 20 (future) |
Service | |
Type | Tram |
System | Guangzhou Trams |
Services | 1 |
Operator(s) | Guangzhou Tram Co., Ltd. |
Depot(s) | Lingfu, Yuyan |
History | |
Opened | 1 July 2020[1] |
Technical | |
Line length | 14.3 km (8.9 mi)[1] |
Number of tracks | 2 |
Character | At-grade, elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Guangzhou Huangpu Tram Line 1 (Chinese: 广州黄埔有轨电车1号线) is a tram line serving the Huangpu District of Guangzhou. The initial section opened on 1 July 2020.[1] The remaining section opened on 28 December 2020. It is 14.3 km (8.9 mi) in length with 20 stations, currently 19 stations are operational.