Red Line (Line 1) | |
---|---|
Overview | |
Status | Proposed |
Termini |
|
Stations | 23 |
Service | |
Type | Rapid transit |
System | Madurai Metro |
Technical | |
Line length | 31 km (19 mi) |
Number of tracks | 2 |
Operating speed | 60 km/h (37 mph) |
The Red Line (Line 1) is one of the three proposed lines of Madurai Metro and the only line which is to be implemented at the Phase 1 of Madurai Metro. The line stretches from Tirumangalam to Chittampatti Junction. The line consists of 22 stations.[1]