Line 1 (Nanchang Metro)

Line 1
 1 
Overview
Other name(s)Nanchang Rail Transit Line 1
Native name南昌地铁1号线
StatusOperational
LocaleNanchang, Jiangxi, China
Termini
Stations24 (Phase 1)
Service
TypeRail Transit
SystemNanchang Metro
Depot(s)Jiaoqiao Train Shed
Yaohu MPD[1][2]
Rolling stock6-car Type B
History
Opened26 December 2015; 8 years ago (2015-12-26)
Technical
Line length28.8 km (17.9 mi)
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead catenary,DC 1500 V
Operating speed80 km/h (50 mph)
Route map

Shuanggang
Kongmuhu Lake
Changjiang Road
Zhujiang Road
South Lushan Avenue
Lüyin Road
Weidong
Connection to Line 2
Metro Central
 2 
Qiushui Square
Tengwang Pavilion
Wanshou Palace
Bayi Memorial
 3 
Bayi Square
 2 
Dinggong Road North
 4 
Beijing–Kowloon Railway
Shidanan Road
Pengjiaqiao
Xiejiacun
Qingshanhu Avenue
Gaoxin Avenue
Aixihu Lake West
Aixihu Lake East
Taizidian
Olympic Stadium
Yaohu Lake West

Nanchang Metro Line 1 (also known as Nanchang Rail Transit Line 1 in official documents) is the first rail transit line ever constructed in Nanchang and has opened in 2015. The Phase 1 of Line 1 runs from Shuanggang to Olympic Stadium, covered North Nanchang (Changbei, Chinese: 昌北), Old Town and East Nanchang (Changdong, Chinese: 昌东). It is planned in Phase 2 that Line 1 will be extended to Changbei Airport to the northwest and Maqiu (Chinese: 麻丘) to the east.