Navi Mumbai Metro Line 1 | |||
---|---|---|---|
Overview | |||
Status |
| ||
Owner | CIDCO | ||
Line number | 1 | ||
Locale | Navi Mumbai, Maharashtra, India | ||
Termini |
| ||
Stations | 20 | ||
Service | |||
Type | Rapid transit | ||
System | Navi Mumbai Metro | ||
Operator(s) | Mahametro | ||
Depot(s) | Taloja | ||
Rolling stock | CRRC Zhuzhou Locomotive | ||
History | |||
Commenced | 28 October 2011 | ||
Opened | 17 November 2023 | ||
Technical | |||
Line length | 23.4 km (14.5 mi) | ||
Number of tracks | 2 | ||
Character | Elevated | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 25 kV 50 Hz AC overhead catenary | ||
Operating speed | 32[1] km/h (20 mph) | ||
|
Line 1 of the Navi Mumbai Metro is part of the rapid transit rail system for the city of Navi Mumbai, India. When fully completed, the 23.40 km fully-elevated line will consist of 20 metro stations from Belapur to Khandeshwar.
Construction on the line began in 2011 and was originally scheduled to open in 2016, but faced several delays. An 11.1 km (6.9 mi) section from Belapur to Pendhar with 11 stations, The Phase 1 of the line was inaugurated on 17 November 2023.