Line 1 (Navi Mumbai Metro)

Navi Mumbai Metro Line 1
Metro Depot in Taloja
Overview
Status
  • Phase 1 - Operational
  • Phase 2 - Planned
  • Phase 3 - Planned
OwnerCIDCO
Line number1
LocaleNavi Mumbai, Maharashtra, India
Termini
  • Belapur
  • Khandeshwar
Stations20
Service
TypeRapid transit
SystemNavi Mumbai Metro
Operator(s)Mahametro
Depot(s)Taloja
Rolling stockCRRC Zhuzhou Locomotive
History
Commenced28 October 2011 (2011-10-28)
Opened17 November 2023 (2023-11-17)
Technical
Line length23.4 km (14.5 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed32[1] km/h (20 mph)
Route map

Line 1 of the Navi Mumbai Metro is part of the rapid transit rail system for the city of Navi Mumbai, India. When fully completed, the 23.40 km fully-elevated line will consist of 20 metro stations from Belapur to Khandeshwar.

Construction on the line began in 2011 and was originally scheduled to open in 2016, but faced several delays. An 11.1 km (6.9 mi) section from Belapur to Pendhar with 11 stations, The Phase 1 of the line was inaugurated on 17 November 2023.