Line 20 (Shanghai Metro)

Line 20
 20 
Overview
Native name上海地铁20号线
StatusUnder construction
LocalePutuo, Baoshan, Jing'an, Yangpu, and Pudong, Shanghai
Termini
Connecting lines 1   3   7   8   10   11   15   18   19   21 
Stations20
Websitewww.shmetro.com
Service
TypeUrban rail transit in China Rapid transit
SystemShanghai Metro Shanghai Metro
Operator(s)Shanghai No. Metro Operation Co., Ltd.
Depot(s)Zhenru depot
Xiangyin Road Parking Lot
Rolling stockClass A 6-car trains
History
CommencedDecember 16, 2022; 23 months ago (2022-12-16)
Planned opening2027; 3 years' time (2027)
Technical
Track length23.8 km (14.8 mi) (Phase 1 full section)
Number of tracks2
CharacterFully underground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)

Line 20 will be a future subway line on the Shanghai Metro. It will run in an east–west direction in northern Shanghai, connecting Shanghai West railway station in Jiading District to Gongqing Forest Park in Yangpu District, with a possible future extension to Zhouhai Road in northern Pudong.[1] It will be about 20 km (12 mi) long with 10 stations. The line was announced by the Municipal government in 2016.[2][3]

  1. ^ "3 new Metro lines to ease pressure". www.shanghaidaily.com. Retrieved 2016-09-22.
  2. ^ "Shanghai Municipal Government: City mulls plan for nine more Metro projects". publicnow.com. 20 April 2016. Retrieved 24 April 2016.
  3. ^ 上海市轨道交通近期建设规划(2017-2025)出炉 规划有9条线路 (in Chinese). Shanghai Municipal Government. 19 April 2016. Retrieved 24 April 2016.