Line 27 (Chengdu Metro)

Line 27
27
Overview
StatusUnder construction
OwnerChengdu
LocaleChengdu, Sichuan
Termini
Stations23
Service
TypeRapid transit
SystemChengdu Metro
Services1
Operator(s)Chengdu Metro Limited
Technical
Line length24.86 km (15.45 mi)
Number of tracks2
CharacterUnderground/Elevated
Track gauge1,435 mm (4 ft 8+12 in)

Chengdu Metro Line 27 (Chinese: 成都地铁27号线) is a Chengdu Metro line under construction in Chengdu, Sichuan, China. It is a tangential line that runs diagonally from the west to the north of Chengdu. The train uses 6 car B-type trains. Line 27's colour is light blue.

On 21 August 2019, the National Development and Reform Commission approved the 4th stage of development plan from Chengdu Rail Transit, which includes Line 27.

The first phase will be from Xindu District Shifo station to Qingyang District Shuxin Road station. The line is 24.86km long with 23 stations. From the north, the line has a 7.52km long elevated section with 6 stations, followed by a 17.34km underground section with 17 stations. Phase 1 started construction on 2020-5-18, and is planned to open by 2024.[1][2]

  1. ^ "成都市轨道交通(2019-2035)最新规划之地铁27号线最全解析篇" (in Chinese). 2020-06-08.
  2. ^ "@成都城北市民:地铁27号线(一期)全线打围施工_四川在线". sichuan.scol.com.cn (in Chinese). Retrieved 2021-03-13.