Line 28 (Beijing Subway)

Line 28
 28 
Construction site in February 2021
Overview
Other name(s)M28 (planned name)
CBD line
StatusUnder construction[1]
LocaleChaoyang district
Beijing
Termini
Stations9
Service
TypeRapid Transit
SystemBeijing Subway
Rolling stock6-car Type LB
History
Planned opening2029; 5 years' time (2029) (planned)[2]
Technical
Line length8.877 km (5.516 mi) (Phase 1)[3]
CharacterUnderground
Operating speed80 km/h (50 mph)[3]
Route map

Dongdaqiao
Jintai Xizhao
Left arrow inner – outer Right arrow
Guanghualu
Hexinqu
Dawang Lu
Line 14
Beijing East railway station
Dajiaoting
Guangqulu
Guangqudonglu
Guangqudonglu depot

Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a rapid transit line under construction in Beijing. It was formerly known as CBD line.

Construction started in July 2021.[1] It is planned to open in 2029.[2]

  1. ^ a b "北京地铁28号线首站启动建设". 2021-07-27.
  2. ^ a b "多座车站开工建设,这条下穿CBD的北京地铁线有了新消息". www.bjews.com.cn. 2023-11-18. Archived from the original on 2023-11-19. Retrieved 2023-12-19.
  3. ^ a b Cite error: The named reference bjrb201908 was invoked but never defined (see the help page).