Chengdu Tram Line 2 | |
---|---|
Overview | |
Native name | 成都有轨电车蓉2号线 |
Locale | Chengdu, China |
Stations | 35 |
Service | |
Type | Tram |
Services | 1 (main & branch) |
Rolling stock | Alstom Citadis 302 |
History | |
Opened | 26 December 2018 |
Technical | |
Line length | 39.3 km (24.4 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 750 V DC Overhead line |
Chengdu Tram Line 2 is a tram line in Chengdu, China. The line has a total length of 39.3 kilometres (24.4 mi) and 35 stations (and will have 47 in the long term). It has a 'Y' layout and runs from the Chengdu West railway station to Pixian West railway station and Hongguang.[1] The line was officially started in December 2015, and the 13.7 km (8.5 mi) demonstration section of the line was opened on 26 December 2018,[2][3] and the remaining sections were opened on 27 December 2019.[4]