Line 2 (Dongguan Rail Transit)

Line 2
 2 
Overview
Other name(s)R2
StatusIn operation
LocaleDongguan, China
Termini
Stations15 (in operation)
Service
TypeRapid transit
SystemDongguan Rail Transit
Operator(s)Dongguan Rail Transit Corporation, Limited
Rolling stock6-car Type B by CRRC Nanjing Puzhen[1] & Bombardier Transportation
History
Opened27 May 2016; 8 years ago (2016-05-27)
Technical
Line length37.7 km (23.43 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed120 km/h designed, operating maximum 110km/h

Line 2 of the Dongguan Rail Transit (Chinese: 东莞轨道交通2号线; pinyin: Dōngguǎn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line in Dongguan. The line currently has 15 stations and is 37.743 kilometres (23.452 mi) long, from Dongguan railway station to Humen railway station. It opened on 27 May 2016. Construction of Line 2 began in 2010.[2][3]

  1. ^ "2号线_运营线路".
  2. ^ "R2线2011年5月份工程进展". Dongguan Rail Transit. 2011-06-01. Archived from the original on 2012-03-30. Retrieved 2011-08-14.
  3. ^ "东莞首条地铁试运行". 东莞阳光网. 2015-12-29. Retrieved 2015-12-30.