Line 2 | |
---|---|
Overview | |
Other name(s) | R2[1] (construction name) |
Status | Operating |
Locale | Jinan |
Termini |
|
Stations | 19 (Phase 1) |
Service | |
Type | Rapid transit |
System | Jinan Metro |
Rolling stock | 6-car Type B |
History | |
Opened | March 26, 2021 |
Technical | |
Line length | 36.39 km (22.61 mi) |
Character | underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 100 km/h (62 mph) |
Jinan Metro Line 2 (Chinese: 济南地铁2号线; pinyin: Jǐnán Dìtiě Èr Hào Xiàn) is a rapid transit line in Jinan, Shandong, China. The line uses six-car Type B rolling stock. The line is 36.39 kilometres (22.61 mi) in length, including a 34.8-kilometre (21.6-mile)-long underground section.[2] The line began operation on 26 March 2021.[3]