Line 2 (Mumbai Metro)

Line 2 (Yellow Line)
BEML Rolling stock of Mumbai Metro Line 2
Overview
Status
  • Line 2A (Operational)[1]
  • Line 2B (Under Construction)
OwnerMMRDA
LocaleMumbai, Maharashtra, India
Termini
Stations17
WebsiteLine 2A
Line 2B
Service
TypeRapid Transit
SystemMumbai Metro
Operator(s)Maha Mumbai Metro Operation Corporation Limited (MMMOCL)
Depot(s)Charkop (2A)
Mandale (2B)
Rolling stockBEML
Daily ridership212,000 (July 2023)[2]
History
CommencedNovember 2016 (2016-11)
Opened2 April 2022; 2 years ago (2022-04-02)
Technical
Line length18.589 km (11.551 mi)
Number of tracks2
CharacterGrade-separated, Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 Kv AC Overhead catenary
Route map

Line 2
0.0000
Dahisar East Line 7 - Red Line and Line 9
Mahatma Gandhi Road
0.7110
Anand Nagar
Western line Left arrow Dahanu Road and Churchgate Down arrow
2.4227
Kandarpada
3.3831
Mandapeshwar
4.4684
Eksar
5.5375
Borivali West
6.4659
Pahadi Eksar
7.5718
Kandivali West
8.2003
Dahanukarwadi
Charkop Depot
9.5355
Valnai
10.8460
Malad West
12.2434
Lower Malad
13.1831
Bangur Nagar
14.4555
Goregaon West
15.4687
Oshiwara
Adarsh Nagar Line 6
16.4330
Lower Oshiwara
17.5786
Andheri West
D N Nagar Line 1 - Blue Line
18.6376
ESIC Nagar
20.3026
Prem Nagar
20.8292
Indira Nagar (Vile Parle)
21.9025
Nanavati Hospital / Up arrow towards Dahanu Road
23.5094
Khira Nagar and Santacruz on Western line
24.4660
Saraswat Nagar
25.5590
National College (Bandra)
26.6997
Bandra and Bandra on Western line
Left arrow towards Churchgate
28.9139
Income Tax Office (BKC) Line 3 - Aqua Line
Vakola Nala
30.1880
ILFS, BKC
30.8928
MTNL, BKC
32.7202
SG Barve Marg
Central line Left arrow CSMT and Kalyan Right arrow
Lokmanya Tilak Terminus Flyover Road
Harbour line Left arrow CSMT and Panvel Down arrow
34.3492
Kurla (East)
Line 4
35.3563
Eastern Express Highway
35.9967
Chembur
VNP and RC Marg Junction
on Mumbai Monorail
36.9590
Diamond Garden
37.8190
Shivaji Chowk (Chembur)
38.9396
BSNL, Govandi
Up arrow towards CSMT
40.5467
Mankhurd and Mankhurd on Harbour line
Right arrow towards Panvel
41.5074
Mandala
Mandala Depot

Line 2 (Yellow Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. The line connects Dahisar in the northwest with Mandale in Mankhurd via Andheri, BKC and Chembur in the east. Phase One of Line 2A was partially opened on 2 April 2022 from Dahisar East to Dahanukarwadi.

Construction on the first section of the line, called Metro 2A (between Dahisar and D.N. Road), began in November 2016, and was completed in April 2022. This section shall be 18.589 km (11.551 mi) long, and comprise 17 of the 39 stations that form part of this route. The new 9.5 km (5.9 mi) section of the Yellow Line from Dahanukarwadi to DN Nagar was inaugurated on January 19, 2023, by Prime Minister Narendra Modi.[3]

  1. ^ Mishra, Lalatendu (21 July 2016). "MMRC gears up to start work on Metro-3". The Hindu.
  2. ^ "Two Mumbai Metro lines report record single-day ridership of 2.14 lakh amid heavy rain". cnbctv18.com. 20 July 2023. Retrieved 30 September 2023.
  3. ^ "Mumbai Metro Red and Yellow Line and Navi Mumbai Metro will be Inagurate on 19th Jan|TGT SPECIALS". YouTube.